iProdTech were contracted to provide support to an FDP study which included review of existing ESP wells and high level Artificial Lift review for future development wells. The work included:
Based on the findings of the study, further work was requested by the client to determine gas lift requirements (gas lift pressure and gas lift rate) for proposed wells for feasibility analysis since the option to import gas from other nearby fields was being investigated.