iProdTech were commissioned to undertake a gas lift study, the results of which are being used to support a FEED study for well workovers/re-completions and facilities upgrade. Specific analyses to be performed included:
The study also included a review of the installed facilities’ processing capacity and comparison with the current and future expected well capacity with gas lift. Recommendations were made regarding future facility upgrades to handle the additional potential due to gas lift introduction.
07/08/2020