iProdTech were contracted by an E&P company to conduct a review of their well completion design for future development wells in an onshore field located in the Kurdistan region in Iraq. The specific focus of the completion design review included the following areas: Cemented, cased and perforated versus openhole sandface completions including alternative options for […]
read moreiProdTech were commissioned to undertake a gas lift study, the results of which are being used to support a FEED study for well workovers/re-completions and facilities upgrade. Specific analyses to be performed included: Assessment of the preferred gas lift injection pressure. Determination of the optimum gas lift rates over the expected life of field conditions. […]
read moreiProdTech were requested to provide support in building a GAP network model which will be used in a Digital Oil Field project for an unconventional oil/gas field with 1,500+ wells. The scope of the study included defining the network modelling strategy and building a template GAP model design for a selected area which could then […]
read moreiProdTech were contracted to provide support to an FDP study which included review of existing ESP wells and high level Artificial Lift review for future development wells. The work included: Investigation into production potential and ESP performance of existing wells. Highlighting possibility of any mechanical issues. Highlighting inflow performance/PI deterioration if observed. Recommendation regarding ESP […]
read moreiProdTech were requested by an E&P company to conduct a review of wells for reactivation in two mature oil fields in Nigeria onshore which had been shut-in in the early 1990s. The well review was used to prioritise key development areas for field re-activation as well as to identify the highest ranked wells for re-start and well intervention opportunities…
read more